Our Painting Process: 12 Steps From Inspection to Handover
Every Mr Painter Dubai job, from a single bedroom to a full villa or office floor, follows the same 12-step process. It is how we keep quality consistent and make sure there are no surprises for you.

Before We Paint
4 steps- Step 1
Enquiry
You call or WhatsApp us with photos and basic details of the property.
- Step 2
Site Inspection
An estimator visits, measures every surface and takes moisture readings.
- Step 3
Written Quotation
A room-by-room scope with paint products, coats, exclusions, schedule and VAT.
- Step 4
Booking and Permits
We confirm dates and prepare building management or community paperwork.
While We Paint
4 steps- Step 5
Protection
Furniture is wrapped, floors sheeted, and fittings and sockets masked.
- Step 6
Surface Preparation
Cracks filled, loose paint removed, walls skimmed and sanded smooth.
- Step 7
Priming
The right primer for each surface: sealer, stain blocker, alkali-resistant or metal.
- Step 8
Two Finish Coats
Cut in by brush, then rolled or sprayed, with full drying time between coats.
After We Paint
4 steps- Step 9
Quality Inspection
The supervisor checks every wall in daylight and under room lighting.
- Step 10
Snag Walk With You
We walk the property together and correct any marks on the spot.
- Step 11
Clean-Up and Handover
Masking removed, furniture returned and rooms left clean and usable.
- Step 12
Warranty and Aftercare
A written 2-year workmanship warranty and leftover paint labelled for touch-ups.
Your Role and Our Role in the Painting Project
What We Ask of You
- Share photos and access details for the property
- Choose colours, or ask us for colour advice
- Remove small valuables and fragile decor
- Arrange access with building security if needed
- Join the final snag walk before handover
What We Take Care Of
- Inspect, measure and quote in writing
- Handle permits, lift bookings and documents
- Move and protect furniture and floors
- Prepare, prime and paint every surface
- Clean up daily and hand over a finished space
Quality Checkpoints on Every Painting Job
Our supervisors sign off each stage before the next one starts. Problems are caught while they are still easy to fix, not discovered at handover.
- Moisture reading below safe levelBefore priming
- All cracks and holes filled and sanded flushBefore priming
- Primer coverage complete with no missed patchesBefore first coat
- Straight cut-in lines at ceilings, skirting and framesAfter each coat
- Even colour with no roller marks or flashingAfter final coat
- No paint on floors, sockets, glass or fittingsBefore handover
How Long Each Type of Painting Job Takes
Typical working days for a same-colour repaint with a standard crew. Your quotation includes an exact schedule.
Planning a budget too? See our painting cost guide.
How We Keep You Updated During the Job
WhatsApp Group per Job
One chat with you, the supervisor and the estimator for quick questions and photos.
Daily Progress Updates
A short end-of-day message with photos and the plan for tomorrow.
Named Supervisor
One person responsible for your project from start to finish.
How to Prepare Your Home Before Painting Day
We move and protect furniture ourselves, but a few small steps help the crew start on time and finish faster.
- 1Take down frames, mirrors and wall decor
- 2Pack away small valuables and fragile items
- 3Empty shelves on walls being painted
- 4Book the service lift if your building requires it
- 5Arrange parking for the crew vehicle
- 6Confirm your final colour choices
What Happens on a Typical Painting Day
8:00 AM
Crew arrives, supervisor walks through the day's rooms with you
8:30 AM
Furniture moved, floors sheeted, fittings masked
10:00 AM
Repairs, sanding and priming
1:00 PM
Finish coats while earlier coats dry
6:30 PM
Clean-up, rooms made usable, progress update sent
How We Handle Changes and Extra Work
Sometimes you decide to add a room, change a colour or we find hidden damage behind old paint. We never just add it to the bill. The supervisor explains the change, sends a written price on WhatsApp and only starts once you approve it.
Payment Terms, Clearly Written
Your quotation sets out the full payment schedule before anything starts, including VAT. For most residential jobs, a booking payment secures your dates and the balance is paid after the snag walk, once you are happy with the finish.
How Our Process Adapts for Commercial Projects
Offices, shops and clinics follow the same 12 steps, with extra controls for occupied buildings. Read more on our commercial painting page.
- Method statement and risk assessment
- Building management permits
- Night and weekend scheduling
- Zoned work so areas stay open
- Facility manager sign-off at each stage
- Daily HSE checks on site
Aftercare and Warranty
Every job comes with a written 2-year workmanship warranty covering defects such as peeling or blistering caused by our application. We also leave labelled leftover paint and simple care tips, such as waiting a couple of weeks before scrubbing freshly painted walls.
Start Your ProjectPainting Process FAQs
How Soon Can You Start After I Accept the Quote?
Most residential jobs start within a few days of acceptance, depending on the season and any building permits required. We confirm the start date in writing.
Do I Need to Be at Home While You Paint?
No. Many clients give access and return in the evening. We only need you at the start to confirm colours and at the end for the snag walk.
What Happens If I Am Not Happy With an Area?
Tell us during the snag walk or within the warranty period. The supervisor will inspect it and we will correct it at no extra cost if it is our workmanship.
Do You Leave Leftover Paint?
Yes. Leftover paint is labelled with the room and colour name, so future touch-ups match perfectly.